Victory for Land Actors over Planning Authority – Part VI

High Court Judge Justice Raulston Glasgow – was the judge who presided over the matter

High Court Judge Justice Raulston Glasgow has delivered a judgment in a case that could have far-reaching implications for the conduct of Environmental Impact Assessment (EIA) for development projects in Grenada.

The judge handed down his ruling in a case brought by Grenada Land Actors Inc against the government-controlled Planning and Development Authority (PDA) of Grenada.

The judge took issue with the EIA done by companies for some of the major projects on the island – Levera Development, Mt Hartman and La Sagesse as raised by Grenada Land Actors (GLA).

He also chided PDA for the manner in which it was handling its business on behalf of the state.

The case attracted a battery of lawyers Leslie Thomas K.C and former high court judge Rita Joseph-Olivetti for GLA. Sydney Bennett K.C, Aleya Williams and Caryn Adams appeared for PDA, John Carrington K.C, Sheila Harris, Anand Ramlogan SC, Gina Dyer Munro and Daniella Williams-Mitchell as well as husband and wife Darshan Ramdhani K.C, and Sabrita Khan-Ramdhani along with Sydni Walker for the other Interested Parties in the case.

As a public service, THE NEW TODAY reproduces in full the Justice Glasgow ruling that can have implications for major development projects on the island:-

[199] In this regard, the policy underpinning the decisions is not one that ought to concern the court. The review is not a merit based one, it is a review of the process by which the planning authority made its decision. Importantly, and as correctly observed by PADA, “[I]t is for the Authority to determine whether planning permission is to be granted even in circumstances where the permitted activity involves the risk or likelihood of foreseeable environmental loss”.

[200] It is also apparent from the Act that PADA has been given a broad discretion to make decisions about the grant of planning permission, based on certain criteria. Where statutes give the discretion to make a decision, the court will only concern itself with whether the planning authority, in arriving at its decisions, followed the criteria set out in the statute. The court will also assess if the planning authority did so in a manner that was procedurally fair and arrived at a decision that is not so outrageous or defiant of logic that it could be said that no reasonable decision maker would have so done. As found by Lord Bingham in R v Secretary of State for the Home Department ex parte Hindley, the threshold of irrationality for the purposes of judicial review is a high one. Lord Bingham reasoned,

“This is because responsibility for making the relevant decision rests with another party and not with the court. It is not enough that [the court] might, if the responsibility for making the relevant decision rested with [it], make a decision different from the appointed decision-maker. To justify intervention by the court, the decision under challenge must fall outside the bounds of any decision open to a reasonable decision- maker.”

The question of EIAs
[201] Before embarking on an interrogation of each individual project, I observe GLA’s continuous lament throughout the claim about the purported inadequacy of the EIAs presented by the Interested Parties to PADA. GLA’s claim against PADA in its totality, when assessed closely, revolves around GLA’s perception of inadequacy of the EIAs. These purported inadequacies, GLA claims, substantiate the allegations of irrationality or unreasonableness in PADA’s decisions.

[202] The parties would do well to remember that where reasonableness is concerned, the guiding principle is not one of adequacy, but one that requires the court to assess the reasonableness of PADA’s decision to grant or refuseplanning permission. We are at this juncture concerned about the EIAs and as such, the question would be whether it was reasonable for PADA to rely on the EIAs to arrive at its decisions. The exercise is therefore highly fact sensitive and does not occur in a vacuum.

[203] It is only where the court finds that the decision to rely or not to rely on a document is so unreasonable or in defiance of logic, that the court will step in under its administrative jurisdiction to assess the totality of the circumstances and if needed, rectify the matter. It goes without saying though that what is contained in the document is quite relevant to such discourse. If what is contained in the document is so inadequate that no reasonable decision maker would rely on the material to arrive at a decision, then it may be the case that the decision, if not otherwise supported, may be found to be unreasonable.

The law with respect to EIAs
[204] Something needs to be said at this juncture about the law on EIAs. Again, the submissions on this issue presented by all the parties and in particular, GLA and PADA are quite extensive. I have extracted a helpful conspectus on the issue from PADA’s submissions presented on 20th October 2024 –

(1) “The adequacy of an EIA is to be judged against the requirements of its framing legislation. It to be treated as a nullity only if it is so deficient as to frustrate the legislative purpose for which an EIA was required”

(2) The test is set out in the case of Prineas v Forestry Commission of New South Wales and Others where it was observed that – “I do not think the [statute]…imposes on a determining authority when preparing an environmental impact statement a standard of absolute perfection or a standard of compliance measured by no consideration other than whether it is possible in fact to carry out the investigation. I do not think the legislature directed determining authorities to ignore such matters as money, time, manpower… In my opinion, there must be imported into the statutory obligation a concept of reasonableness…Provided an environmental impact statement is comprehensive in its treatment of the subject matter, objective in its approach and meets the requirements that it alerts the decision maker and members of the public…to the effect of the activity on the environment and the consequences to the community inherent in the carrying out or not carrying out of the activity, it meets the standards imposed by the regulations. The fact that the environmental impact statement does not cover every topic and explore every avenue advocated by experts does not necessarily invalidate it or require a finding that it does not substantially comply with the statute and the regulations.”

(3) It is observed that the Act sets out in section 2 the definition of an EIA as “… the process of collection, analysis, evaluation and review of information on the likely effects of a proposed development on the environment and the means to overcome adverse effects which enables the Authority to determine whether development permission should be granted and with what conditions.”

(4) The foregoing mustbe read inconjunction with the prescriptions of section 3 which mandate the object and purpose of the Act. Read together with the definition of an EIA in section 2, it suggests that the purpose of the EIA is to outline “…the relevant effects of the proposed development or the likely effects upon ‘the physical environment within which human settlements are situated in Grenada’ and on ‘the quality of life of every person in Grenada’. It is to gauge the effects of the development on ‘the sustainable use of land in the interests of all the people of Grenada;’ and the effect that the development will have on the ‘the cultural heritage of Grenada, as it finds expression in the natural and the built environment…” In doing so, a “broad and purposive approach” ought to be adopted.

(5) Section 22, addressed below, sets out the requirement for and the process by which an EIA is compiled. “… the purpose which an EIA is intended to serve is to bring the likely significant effects of a proposed development to the attention of the Planning and Development Authority and in particular, the Environmental Assessment Committee in order that the probable significant environmental consequences of a proposed development can be properly understood.”

(6) Regulations are to be made by the relevant Minister to achieve these objects, but none have been promulgated. In the absence of regulations setting out minimum standards to be met by an EIA, it is for the planning authority to decide whether the EIA meets the requisites of the endeavor. The court will decide whether the planning authority acted properly in arriving at this conclusion. The court will conduct this assessment along the “Wednesbury” reasonable test principles.

[205] As recounted in Regina (Khatun and Others) v. Newham London Borough Council108 per Laws LJ –

“… [W]here a statute conferring discretionary power provides no lexicon of the matters to be treated as relevant by the decision- maker, then it is for the decision-maker and not the court to conclude what is relevant subject only to Wednesbury review. By extension it gives authority also for a different but closely related proposition, namely that it is for the decision-maker and not the court, subject again to Wednesbury review, to decide upon the manner and intensity of inquiry to be undertaken into any relevant factor accepted or demonstrated as such.”

[206] It will be also helpful to recite PADA’s statutory duties where an application for planning permission is made and the importance of an Environmental Impact Assessment to that application. Section 22 deals with PADA’s statutory duties for Environmental Impact Assessments and reads –

“(1) The Authority may require an Environmental Impact Assessment to be carried out in respect of any application for permission to develop land, including an application for approval in principle, if the proposed development could significantly affect the environment.

(2) Unless the Authority for good cause otherwise determines, an Environmental Impact Assessment shall be carried out in respect of any application for development of a kind mentioned in the Third Schedule.

(3) The Authority shall not grant permission for the development of land pursuant to an application to which this section applies, unless it has first taken the report on the Environmental Impact Assessment into account.

(4) …

(5) If the Authority notifies an applicant that an Environmental Impact Assessment is required, the Physical Planning Unit and any other public agency shall, if requested by the applicant, may consult with the applicant, to determine whether that agency has in its possession any information which may be relevant to the preparation of the Environmental Impact Assessment and, if it does, the agency may make any such information available to the applicant, on payment of a reasonable cost but the agency is not required to disclose confidential information to the applicant.

(6) Where the Authority issues a notice under sub-section (1), it shall inform any public agency or department of Government having responsibility for issuing licences, permits, giving approvals, consents or any other document of authorization in connection with any matter affecting the development, such public agency or department of Government shall not grant a licence, permit, or give its approval, consent or issue any document of authorization, unless the Authority notifies the agency or department of Government that the notice was complied with and that the Authority granted permission for the proposed development.

(7)…”

[207] Section 23 of the Act outlines PADA’s statutory duties for determining applications and reads –

“(1) Where the Authority receives an application under section 19, the Authority shall have regard to the approved physical plan for the area within which the land is situated, if any, and to any other material considerations, and may grant permission to develop land with or without conditions as it thinks fit, or may refuse permission.

(2) …

(3) If after considering an application and any plans submitted with it, the Authority considers it necessary so to do, the Authority may return the plans to the applicant for amendment and, the applicant shall return the amended plan within the time specified by the Authority and, the running of time for conveying its decision to the applicant is suspended for the purposes of section 24, until the amended plan is resubmitted by the applicant to the Authority.

(4) If the Authority grants permission with conditions to any person to undertake any development, the Authority may, if it considers it necessary, enter into any arrangement or agreement with the person in order to give effect to the conditions.

(5) The Authority may require any developer to provide a bond, or any other instrument of guarantee of performance, in such sum as the Authority considers necessary to give effect to any permission to undertake development.

(6) Notwithstanding subsections (3) and (4) and anything that may be done under them, the Authority may, at any time, revoke its permission to develop the land in question or any part thereof, without compensation, if any condition attached to the permission to develop the land is not complied with.

(7) The term “material considerations” in subsection (1) includes site assessment reports by the staff of the Physical Planning Unit, reports or studies covering the area of the proposed development, any prescribed planning or building standards, and where applicable, the environmental impact assessment report and any representations made by persons who may be affected by the proposed development.”

Material considerations
[208] I observed that the concept of a ‘material consideration’ is as recited in section 23(7) of the Act. GLA asserts that PADA acted unlawfully by not taking certain material considerations into account, and alleges that if PADA had done so, it would have found various issues as pressing and refused to grant planning permission. GLA relies on R (Alconbury Developments Ltd) v Secretary of State for the Environment, Transport and the Regions to suggest that a decision maker is required to consider material or relevant considerations and that failure to do so is a public law error that can lead to the decision being quashed on judicial review.

[209] In this regard, GLA charges that its reviews of the EIAs for the 3 projects were material considerations but that same were not considered by PADA at all in its assessment of the EIAs and more generally on whether to grant permission. GLA challenges the evidence of PADA’s witnesses, singling out GLA’s Levera review, which was sent directly to PADA. GLA insists that this Levera review, was a material consideration in accordance with section 23(7) of the Act.

[210] The question to be asked is whether PADA was obliged to take the Levera review or any other review prepared and presented by GLA into account? Section 23 of the Act dictates what PADA is to consider when making its decisions and specifically defines a material consideration in section 23(7) of the Act. What is a material consideration has also been addressed and explained in case law. In R v Somerset County Council ex parte Fewings it was observed that –

““First, those clearly (whether expressly or impliedly) identified by the statute as considerations to which regard must be had. Second, those clearly identified by the statute as considerations to which regard must not be had. Third, those to which the decision-maker may have regard if in his judgment and discretion he thinks it right to do so. There is, in short, a margin of appreciation within which the decision- maker may decide just what considerations should play a part in his reasoning process.”

[211] In R (on the application of Transport Action Network Limited) v The  Secretary of State for Transport per Holgate J, it was noted that –

“In R (Oxton Farm) v Harrogate Borough Council [2020] EWCA Civ 805 the Court of Appeal endorsed at the following summary of the legal principles:-

“In R (Samuel Smith Old Brewery (Tadcaster)) v North Yorkshire County Council [2020] PTSR 221 the Supreme Court endorsed the legal tests in Derbyshire Dales District Council [2010] 1 P & CR 19 and CREEDNZ Inc v Governor General [1981] 1 NZLR 172, 182 which must be satisfied where it is alleged that a decision-maker has failed to take into account a material consideration. It is insufficient for a claimant simply to say that the decision-maker did not take into account a legally relevant consideration. A legally relevant consideration is only something that is not irrelevant or immaterial, and therefore something which the decision-maker is empowered or entitled to take into account. But a decision-maker does not fail to take relevant consideration into account unless he was under an obligation to do so. Accordingly, for this type of allegation it is necessary for a claimant to show that the decision- maker was expressly or impliedly required by the legislation (or by a policy which had to be applied) to take the particular consideration into account, or whether on the facts of the case, the matter was so “obviously material”, that it was irrational not to have taken it into account.” (bold emphasis mine)

[212] In The Landings Proprietors Unit Plan No 2 of 2007 v Development Control Authority, our Court Appeal opined that –

“There are three categories of considerations (i) those clearly identified by statute as considerations to which regard must be had, (ii) those clearly identified by statute as considerations to which regard must not be had and (iii) those to which regard may be had in the discretion of the decision-maker. This third category can be divided into two sub- categories: (1) considerations to which the decision-maker makes no reference and (2) considerations which are adverted to by the decision- maker but given no weight. Where the decision-maker makes no reference to a consideration which falls into the third category his decision is not unlawful unless the consideration is obviously material in accordance with the Wednesbury test of irrationality. Likewise, where such a consideration is referred to by the decision-maker but he accords no weight to it, his decision is not unlawful unless no reasonable decision-maker could have done so.”

[213] If one looks at the matter from the standpoint of material that is “obviously material”, I am hard pressed to see how, without more, a review of the EIA by persons, whether self-asserted expert or not, amounts to information that must be obviously considered by the PADA. It may be material that the PADA considers in arriving at its decision and attach such weight at it sees fit. But it cannot be material, without more, that the PADA is duty bound to consider and with which it must concur. If it were otherwise, the process would condescend into a discourse about meeting the standards for development as dictated by experts like GLA, and not as parliament dictated, decisions made by the persons employed at the PADA.

[214] More tellingly in this case is the fact that there is no express statutory obligation on the part of PADA to consider the expert reviews conducted by GLA. Now, PADA has said that it did consider the reviews, but ultimately it must be PADA’s decision whether to adopt those views or to take its own view on the other material before it.

[215] It also appears from GLA’s arguments that it hinges part of its claim on the requirement to consider “any representations made by persons who may be affected by the proposed development.” The entire society may be said to be affected by the development in one way or another, but as PADA rightly points out, to say that one has standing to bring a claim of this sort is quite separate and apart from saying that one is a person affected by the proposed project. In the former sense, anyone who has a sufficient interest in the conservation of the environment may be well placed to seek a judicial review of the propriety of planning actions. That may not always be synonymous with cases of persons affected by the development.

[216] The foregoing approach makes sense to me since, if it were otherwise, I could see how, for instance, the process of decision making by the PADA could become an endless discourse and debate with competing expertise. The overall object of the planning laws is to set a mechanism in place that ensures that the policy of government to develop lands is executed in a purposeful and sustainable manner, taking as many factors into consideration as possible. The task is not one to find an arithmetical solution to every possible concern that may attend the process.

[217] The planning process is not an academic excursion of drawing straws on what ought to be done or a debate of perfection. It is also not a discourse in overcoming hurdles identified by experts. Rather, the object of the planning law is to find a pragmatic, balanced and common-sense approach to development in a manner that preserves the environment as far as possible. It is for this reason that the statute identifies several material considerations to be considered by the PDA in arriving at its decisions. The opinions of experts who are not appointed as experts in the statutory sense or who cannot show that they are, as contemplated by the section “persons affected by the development”, no matter how well intentioned their endeavors, is not part of the matters that PADA is obligated to consider in making its decisions.

[218] Even if PADA takes these opinions into account, nowhere is it stated or presumed that PADA is bound by these views. What the case law does indicate and rightly so, is that where PADA is duty bound to take certain factors into consideration or shows that it has so done, so long as the decision to which it arrives after doing so does not appear to be so outrageous that no reasonable authority would come to such a decision, then the PADA is deemed to have acted properly.

THE LEVERA PROJECT
[219] GLA alleges that PADA’s decisions between June 2020 to 15th June 2023 to grant permission for Levera to commence development for

(1) temporary workers housing,

(2) the golf course and

(3) the entire Levera development

were unlawful and irrational due to GLA’s view that PADA granted permission without the benefit of objective, adequate and comprehensive EIAs. GLA also charges that PADA acted unlawfully by failing to consider relevant or material considerations, namely the EIA review of the project done by GLA.

Temporary worker’s housing
[220] With respect to the temporary worker’s housing, GLA asserts that PADA placed reliance on outdated EIAs submitted for a different project. Those outdated reports, GLA claims, were also compiled before the Levera site was assigned a “Ramsar designation”. In addressing this complaint, PADA’s unchallenged evidence is that they had previously received EIAs and reports for the development area, which were considered along with the plans proposed by the developers. PADA’s evidence is also that site inspections were conducted, which aided PADA in concluding that there were no serious environmental concerns about the site proposed by Heng Sheng for the temporary living quarters.

[221] Considering the aforestated principles, I am hard pressed to see how PADA’s decision on the temporary worker’s quarters was flawed when tested against the principles in CCSU. The approach adopted and explained by PADA clearly considered several prior submitted EIAs of the same area, and it was determined that the proposed development of the temporary worker’s housing was for all intents and purposes not particularly significant.

[222] Upon review of the prior EIAs and other reports which PADA indicated were considered, including those done in 1988 and 2002, there was a plethora of material covering several environmental issues such as sea turtle conservation, geological investigations, and mangrove conservation. That GLA disagrees with PADA on the merits of those assessments does not demonstrate, in my view, that PADA acted unreasonably or unlawfully, as the law does not preclude PADA from considering previously submitted EIAs when making a decision.

[223] GLA charges that PADA ought to have asked for updated assessments, which one may very well commend as a prudent course of proceeding. The test, however, is whether the steps taken by PADA were lawful, procedural fairly and reasonable. That GLA or this court would have adopted another course or in our view, it would have been more prudent to adopt another course is to adopt a posture that would place this court and GLA in the chair of the decision maker. As stated in R (on the application of Suffolk Energy Action Solutions SPV Ltd) v Secretary of State for Energy Security and Net Zero.

“The manner and intensity of any inquiry into any matter which the Authority considers to be material is a matter for them, subject only to the supervisory jurisdiction of the court. So too is the weight they decide to attach to any particular factor. Any decision made by the Authority about whether they have sufficient information on which to make a recommendation, or to make a decision to grant or refuse development consent (as the case may be), is only open to challenge on the basis that no reasonable authority could have been satisfied on the basis of the enquiries made that it possessed the information necessary for the making of the decision.” (bold emphasis mine)

[224] It is important to remember that the Act does not specify the time frame within which an EIA can be considered outdated or irrelevant. Planning bodies may well be advised to have the most current and up to date material available to them when they are deliberating on whether to grant permission for a proposed development. This is since, in an appropriate case, the material may be so outdated or irrelevant due to the passage to time, intervening changes to the law or to the environment, that it could quite possibly be argued or proven that the assessments were inadequate or incomplete.

[225] Considering the factual context of prior assessments and minimal work proposed to be done on the site, and in the absence of prescriptions in the Act regarding the time frame within which an assessment ought to be conducted and can be relied on, the test must, again, be whether the planning authority acted in a reasonable manner. It is also noteworthy that the notice of approval was given with several conditions and explicitly stated that an EIA had to be submitted for review and approval by the authority. The notice of approval also recited that Heng Sheng must address specifically outlined environmental and social impacts of the project proposal to obtain final development approval.

[226] Secondly and more importantly, there is nothing presented to this court by GLA that suggests that the previous EIAs relied upon by PADA were so inadequate that a reasonable planning authority would not have given permission to construct the temporary workers quarters or do any form of development. The lamentation that the temporary worker’s quarters were also part of a larger project must also be seen through the same lens. The statute does not instruct PADA to assess whether the application is a component of a larger project. Rather, the statute dictates when an EIA is required and how it ought to be considered in the planning process. There was therefore nothing preventing PADA from assessing the application for approval of the temporary workers quarters separate and apart from the entire project as it did. As PADA rightly points out, when a developer asks for part of a project to be approved, it does so with the knowledge that the entire project may not be approved.

Golf Course
[227] On the issue of the decision to grant permission for the Golf Course, GLA argues that this decision was unlawful because PADA did not have the benefit of a separate EIA for same. In the absence of regulations on this issue, I do not agree that a separate EIA was required, as the golf course does not fall within one of the scope of projects where an EIA is mandatory under Schedule III of the Act.

[228] If PADA did not consider that a separate EIA was necessary, PADA acted well within its remit to determine any application based on a singular EIA or multiple EIAs, once those EIAs are comprehensive and informative on the environmental impact of the project in the Prineas sense and meet the objectives of the Act.

[229] PADA’s response to this charge is that the golf course is not the sort of development for which the Act mandates that an EIA be conducted with which I am agreed. However, PADA also indicates that the golf course was considered as part of the larger project in respect of which a comprehensive EIA was completed. GLA has not shown how this was a violation of the statute or improper in the Wednesbury sense. Later in this judgment I will explore, under the Levera project in its entirety, whether PADA acted properly in granting permission for the golf course. For all the reasons that I have stated above, I disagree that PADA was required to consider the golf course through a separate EIA as alleged.

Entire Levera Development
[230] On this issue, GLA’s complaints are voluminous. In summary, GLA charges that its Levera Review dated 10th February 2023 and GAEA’s Levera Review highlighted several deficiencies in the Levera EIA. GLA assails the EIA as being contrary to best practice, failing to address legislative and other legal requirements, lacking assessments on the environment where hydrology, turtle nesting, fishing and archeology are concerned, and lacking in mitigation measures on adverse environmental effects. GLA also challenged the method and type of data collection done to inform the EIA, and in some instances, uses some of its own research, and that of GAEA, to highlight the purported deficiencies in the EIA.

[231] These charges are where I find that GLA and GAEA’s Levera reviews depart from factual observations on the environmental effects of the development itself and teeters treacherously on being opinion evidence on the EIA submitted. As I have stated earlier, GLA’s opinion on the adequacy of the EIA through its own opinions is only of limited relevance in the sense I have above stated.

[232] For these present purposes, I repeat that these comments made in the reviews will only be considered if they aid the court’s interrogation of the matters in the sense explained previously. Where for instance, the EIAs are found in the Prineas sense to be sufficiently comprehensive and to meet the objectives of informing PADA on the potential impact on the environment by the development proposed by Heng Sheng, it may be hardly appropriate for this court to advert to the review reports.

[233] I am mindful in all this that this judicial review process does not condescend into a reassessment of the application process that was before PADA, with the court substituting its own forensic critique of what PADA did or did not do. To repeat, so long as what PADA did complied with its statutory mandate and was not so outrageous to be in defiance of logic, this court is duty bound to find in favor of its decisions, even if it would have itself given another decision on the same material.

TO BE CONTINUED